River Heights Phase - 2 Payment Plan

Land Craft is happy to be a part of various journeys of lifetime that many of you'd undertake in the homes we craft.

Land Craft presents River Heights Phase-2 at Rajnagar Ext., NH-58 Ghaziabad

Specification River Heights Phase-2

S.No Particulars Standard
1 Kitchen Baroda Green Marble Counter with one sink
2 Fitting and fixtures  
  1. Bathroom fittings Chromium Plated - Classical Range
  2. Sanitary fittings white - Ordinary
3 Internal finish Plaster with OBD
4 Internal Electrification Copper Cables in Pvc conduits, Sheet and Switches
5 internal communication Network Provision of T.V, Telephone & Inter Com
6 Flooring  
  1. Bedroom ( Master Bed Room ) Ceramic Tiles
  2. Bed Room other Ceramic Tiles
  3. Drg /Dinning Imported Vetrified Tiles
  4. Kitchen Ceramic Tiles
  5. Bathrooms Ceramic Tiles
7 Door Shutters  
  1. Bed Room and toilet flush Door with enamel
  2. Main entrance One side teek door
  3. Wash Basin  
8 Door Frames Hard Wood
9 windows  
  1. Balconies Aluminum Door Window Assembly
  2. Rooms Aluminum
10 Super Structure Earthquake Resistant in RCC Frame
11 Masonry Flyash Bricks / Red clay Bricks
12 External Finish Plaster with texture finish
13 Electric Connections Single phase meter

Price List

Floor Area Basic
Rate/Sq.Ft.
Basic Sale
Price
Total including
EDC+EEC
+FFC+CLUB
Area Basic
Rate/Sq.Ft..
Basic Sale
Price
Total including
EDC+EEC
+FFC+CLUB
1 977 1840 1797680 1954460 680 1840 1251200 1366400
2 977 1794 1752738 1909518 680 1794 1219920 1335120
3 977 1748 1707796 1864576 680 1748 1188640 1303840
4 977 1702 1662854 1819634 680 1702 1157360 1272560
5 977 1656 1617912 1774692 680 1656 1126080 1241280
6 977 1633 1595441 1752221 680 1633 1110440 1225640
7 977 1610 1572970 1729750 680 1610 1094800 1210000
8 977 1587 1550499 1707279 680 1587 1079160 1194360
9 977 1564 1528028 1684808 680 1564 1063520 1178720


Floor Area Basic
Rate/Sq.Ft.
Basic Sale
Price
Total including
EDC+EEC
+FFC+CLUB
Area Basic
Rate/Sq.Ft..
Basic Sale
Price
Total including
EDC+EEC
+FFC+CLUB
1 965 1840 1775600 1930700 705 1840 1297200 1415900
2 965 1794 1731210 1886310 705 1794 1264770 1383470
3 965 1748 1686820 1841920 705 1748 1232340 1351040
4 965 1702 1642430 1797530 705 1702 1199910 1318610
5 965 1656 1598040 1753140 705 1656 1167480 1286180
6 965 1633 1575845 1730945 705 1633 1151265 1269965
7 965 1610 1553650 1708750 705 1610 1135050 1253750
8 965 1587 1531455 1686555 705 1587 1118835 1237535
9 965 1564 1509260 1664360 705 1564 1102620 1221320

Booking Amount(15% of Basic Rate )

Floor Area Booking
Amount
Area Booking
Amount
Area Booking
Amount
Area Booking
Amount
1 977 269652 680 187680 965 266340 705 194580
2 977 262911 680 182988 965 259681 705 189715
3 977 256169 680 178296 965 253023 705 184851
4 977 249428 680 173604 965 246364 705 179986
5 977 242686 680 168912 965 239706 705 175122
6 977 239316 680 166566 965 236377 705 172690
7 977 235945 680 164220 965 233047 705 170257
8 977 232574 680 161874 965 229718 705 167825
9 977 229204 680 159528 965 226389 705 165393

Payment Schedule

On Booking 15% BSP
With In 60 Days Of Booking 80% OF BSP + 50% Additional Charges
On offer of Possession 5% OF BSP + 50% Additional Charges

Mandatory Charges

S.No. Name of Charges Per Sq.Ft.
1 EDC @90/Sq.Ft
2 EEC @25/Sq.Ft.
3 FFC @25/Sq.Ft.
4 Club Rs.20000/-

Optional Charges

S.No. Name of Charges Rs.
1 Car Parking Stilt (Subject to availability) 125000/-
2 Car Parking Open 75000/-
3 Two Wheeler Parking 15000/-
4 Power backup Subject to Maximum 2 Kva 15000/-kva
5 Park Facing/pool/road/Corner facing 75/Sq.Ft.

One parking Either car or two wheeler Mandatory

Note :

  • Other charges, registry, stamp duty and other govt. levy, if any, will be extra and to be Borne by the customer.
  • Above mentioned rates can be revised at any time without any prior notice.
  • Acceptance of the application form is solely based on the company's discretion.
  • Company reserves the right to accept or reject any application without giving any Reason, whatsoever.
  • IFMS and Maintenance charges payable at possession.
  • Payment should be made in favour of "“Carol Infrastructure Pvt. Ltd."” by Cheque/ Pay Order/ demand draft payable at any schedule bank in NCR.